Bending Dynamics

Home / Pre-Plated Tubing

Material

Pre-plated hydraulic tubing: the plating is done before we bend.

We build from steel tube that's already zinc-aluminum coated, so your finished parts don't need a separate trip to a plater.

What it removes

Three fewer handoffs per order.

Bare tube 5 handoffs

  1. Tube is bent and flared
  2. Shipped out to a plater
  3. Plated, then shipped back
  4. Received and inspected again
  5. Installed on your line

Bending Dynamics 3 handoffs

  1. Bent and flared from pre-plated tube
  2. Capped, labeled, and shipped to you
  3. Installed on your line

In our experience, sending bent tube out for plating added at least 2 weeks and $3–10 per tube, depending on the part. Pre-plated tube removes that step. Every handoff you remove is one less place for lead time to slip, parts to get damaged, or a second invoice to show up.

The tube

Seamless low-carbon steel hydraulic tube to SAE J524, coated with zinc-aluminum by the tube mill before it ships to us. Chrome VI-free.

What we do with it

We cut, deburr, bend, install nuts and sleeves, flare, cap, and label. The coating is already on the tube, so the finished part ships ready to install.

Have a print? Get a straight answer.

Reply within one business day. Pricing and lead time, or a clear no.

Send a Print for a Quote